The AI Readiness Checklist

The plain list a plant manager works through to know whether the floor can support AI yet. No score to chase, no jargon. Just the questions to answer honestly about your own plant, in the order they actually have to happen.

Read this first · How to use this

This is a checklist you work through about your own plant, not a quiz about ours. Every item is a plain yes or no you can answer from the floor. It is built around one idea: AI runs on data a system can read, and most of a high-production plant still runs on paper, one person's spreadsheet, and machines that talk to nothing. You cannot point AI at a record that only exists as handwriting.

There are no invented numbers on this page. The only figure here is a public rule with a link. Everything else is something you check against your own floor, because an average across other people's plants would not tell you what to fix on yours.

Why this comes before buying AI

Manufacturing software is sold as though the data already exists. The pitch assumes records sit in systems, machines report their numbers, and the figures are current. On most floors that is not the case: much of the week starts as handwriting at a station, and the software only meets it after somebody re-types it.

That gap is the whole problem, because an agent that cannot read the record cannot act on the record. A copilot answering from a system that holds a third of the week gives confident answers about a third of the plant. So the honest first question is not which AI to buy. It is how much of your floor an AI could even see today. This checklist walks you to that answer.

The order it has to happen in

The plants that are actually ready did the same unglamorous thing in the same order: digitize, connect, unify, before any AI. Digitize gets records off paper at the station. Connect gets machines and systems sharing what they already know. Unify pulls all of it into one live layer that is current and entered once. Only then does AI have something to stand on. That sequence is why the checklist is grouped the way it is, and it maps onto the five things a paper audit measures: paper capture points, data latency, machine data escape, re-keying, and trace time.

The five checklist sections

Here is the shape of it. Each section is one part of the sequence, tied to one thing the audit measures. The full checkable items under each are below, sent to your work email or revealed here on this page.

Section 01

Digitize: how much still starts on paper

Measures: paper capture points

Every place a person writes something down that later has to become data. Batch sheets, quality checks, travelers, rounds, downtime logs, handoffs.

Section 02

Connect: what your machines and systems actually share

Measures: machine data escape

Whether counts, states, faults and cycle times leave the machine at all, and whether your ERP, MES, quality and warehouse systems talk without a person carrying numbers between them.

Section 03

Unify: whether your numbers are current and entered once

Measures: data latency and re-keying

How old a number is by the time someone acts on it, and how many hours a week your team spends typing figures that already exist somewhere else.

Section 04

Prove it: can you trace one real lot fast

Measures: trace time

The single most honest test of whether records are connected, because a real trace has to cross receiving, production, quality and shipping in one pass.

Section 05

Before AI: the readiness gate

Measures: what an AI could read today

The handful of checks that decide whether AI agents, copilots and scheduling have anything to run on right now, or whether the foundation comes first.

Prefer to have it scored for you rather than tick boxes by hand? The AI Readiness Assessment is the interactive version: twelve questions, and it returns your score, the phase you are actually in, and your next three actions on screen, free.

The full checklist

Get the full checkable list.

You have seen the five sections above. Enter your work email and the full set of concrete yes-or-no checks opens right here on this page, and a copy goes to your inbox to work through on the floor.

Work email only. We use it to send the checklist and nothing else you did not ask for. Unsubscribe anytime.

Unlocked. The full checklist is open below, and a copy is on its way to your inbox. If you checked the box, a Harmony engineer will reach out to walk it with you.

Where these checks put you: the three phases

The checklist maps onto the same three phases every plant moves through. A high count of checked boxes means you are at the start of Phase 1, whatever you have been sold. That is the most fixable position on the list, because the work is known and unglamorous rather than experimental.

Phase 1

Lay the Data Foundation · Digitization

Every pen-and-paper record digitized at the station, every software system connected, and all of the data unified into one live layer. The digital transformation starts here.

Phase 2

Production & Operations Scale

Factory operations turn proactive: live sensors and machine data, the AI scheduling board, predictive maintenance before failure.

Phase 3

AI-Native Operations

Agents across the floor and the back office act on the live layer: quality signals, reports, copilots. Humans approve.

Want the same five measures counted in person on your own floor? That is the Manufacturing Paper Audit, the long version you walk station by station. And for a dollar figure on what the gaps cost, the ROI Calculators & Tools price it on your own inputs.

Rather have someone walk the checklist with you?

The same walk is the first week of a Harmony pilot, on-site, with forward-deployed engineers doing the counting alongside your team. Phase 1 first, because that is the order it has to happen in. See what the live layer looks like.